Biomass boiler for heating industrial enterprise (Kyiv)

Reconstruction of the biomass boiler room in Kiev. Thermal power plant is 500 kW. As expected the use of the biomass chips. Activities performed Rentechno: Develop a detailed feasibility study of the project «Reconstruction of the biomass boiler heat output of 500 kW.» As part of this project were the following works:

The examination of the subject, and the collection of baseline data;

The analysis of the comparative performance of different biofuels, obtained and analyzed offers suppliers of raw materials and options for the delivery and storage of biofuels.

Search combustion equipment selected fuel type, the receipt and analysis of proposals of producers and suppliers of equipment for several options reconstruction of the boiler (boiler reconstruction with the transition to solid biofuels; partial transition to biofuels to cover the base of the chart thermal loads, peak loads are covered by a gas boiler, turbine construction biofuel CHP, CHP construction on two types of fuel — natural gas and biofuels).

Defined financial and economic indicators of the project taking into account the existing risks;

Prepared a financial model for the selected option reconstruction of the object.


« »